Backup and recovery
Backup and recovery for project files, drawings and models
A project firm’s work is its drawings, its models and the email around them. CloudWorks Solutions keeps separate copies of all of it, including the workstation setups behind your design software, and proves the copies work with test restores of real project folders.
Backup and recovery for project firms means every drawing, model, mailbox and workstation setup has a separate copy, proven by a test restore of a real project folder.
Three taps
Could you get it back?
Three taps show what your backup has to include for the thing you would most need back, and what we would test.
What the Restore Check covers
Three taps match what you would most need back to what the backup must include. The table is below.
What your backup has to include
| If you need back | The backup must include | What we test |
|---|
Files that live only on workstations are the first thing we would move somewhere that is backed up.
Cloud project platforms keep their own copies. We check what they keep, for how long, and how you would get a file back.
Microsoft keeps the service running; a backup of Microsoft 365 email and files is a separate job. More: Microsoft 365 for project-based firms.
With files in several places, we would start by listing each place and whether anything backs it up today.
A backup is proven only by a restore. We would test one with a real project folder in the first 30 days.
You have tested a restore recently. On the call we would look at what was restored and what it took to find it.
Think you have been hacked, or has money already moved? Contact ACS Cyber, the cybersecurity division of Atlantic Computer Systems.
| If you need back | The backup must include | What we test |
|---|---|---|
| One deleted drawing or model | File versions kept long enough to reach last month's copy | Restoring one named file to its folder |
| A whole project folder | The folder, its permissions and the links between its files | Restoring a real project folder to a new place |
| A mailbox | Email backed up outside Microsoft 365 | Restoring one mailbox folder |
| A whole workstation | A copy of the machine's setup, drivers and design software settings | Rebuilding one workstation from the copy |
| Everything at once | A copy kept apart from your network and your everyday sign-ins | A written restore order that says what comes back first |
How this tool decides
- What you would most need back picks the row; where files live and the last test add one line each.
What travels with your booking: . It goes into the booking form as "How you found us", where you can change or delete it. Nothing you tap here is saved or sent until you book.
You will speak with Grant.
Prefer to talk first? Call 1-650-300-7557.
How we do it
What we copy, where copies live and how we prove them
Written for architecture firms, engineering firms and any firm whose work lives in drawings and models. See how backup fits the IT services we run for your firm.
01
What is copied
Project folders on office servers and in Microsoft 365, mailboxes, and the setup of each design workstation: drivers, software settings and license configuration (see CAD and BIM workstations). Files that live only on one workstation are moved somewhere that is backed up.
02
Separate copies
At least one copy is kept apart from your network and your everyday sign-ins, so the backup does not depend on the same accounts as the files it copies. Microsoft 365 email and files get their own backup; see Microsoft 365 for project-based firms.
03
Test restores
A backup is proven only by a restore. We would test one with a real project folder in the first 30 days, then on a schedule agreed with you, and keep a written restore order that says what comes back first.
04
Large models
BIM and CAD models are large and change every day. We size the backup and the versions kept for them, and check that a model comes back with its linked files, not as a lone file.
Restore tests
What a restore test proves
A test restore of a real project folder answers questions a backup report cannot.
- The copy exists and is complete, including the files it links to
- Folder permissions come back, so the right people can open the files
- Last month’s version of a drawing can be found and brought back
- A mailbox folder can be restored without touching the rest of the mailbox
- A workstation can be rebuilt with its drivers and design software settings
- The written restore order still matches what the firm needs first
- Someone other than the person who set it up can run the restore
- How long the restore took, written down for next time
Project continuity
Keep project work moving while systems are restored
The plan starts before an outage: you decide which projects matter most, what work can pause and which interim methods are acceptable. Actual recovery depends on the failure, the data and the vendors involved, so restore-test results inform the plan rather than create a fixed promise.
01
Agree how interim work will run
Decide which tasks can continue on another workstation, through a tested remote-access route or from a read-only project copy. Give every interim edit an owner and a place to record it, so the team does not create uncontrolled duplicate models or drawings.
02
Put priority projects in the written order
You name the live projects and deadlines that come first. We record their linked files, permissions, workstation needs and dependent vendor services, then revisit that order with you if the incident changes what the firm needs.
03
Set client-agreed recovery objectives
Agree how much work the firm could stand to redo (the recovery point objective) and how quickly it wants a workable project environment back (the recovery time objective). Test restores against those targets and record any gap; the objectives are not fixed recovery promises.
04
Keep vendor communication in one log
Record error messages, timestamps, affected projects, vendor case numbers and the next update. CloudWorks supplies the workstation, account and network facts and coordinates the call; the software vendor handles its application or cloud service, while you decide the client-facing project message.
05
Plan failback before normal access resumes
Reconcile interim edits, check linked files and permissions, and open a representative project with the people who use it. Return users in the order you agree, record any remaining issues and update the restore order and interim-work instructions for next time.
Apply the plan
Continue and reconcile project work during a Microsoft 365 outage
Microsoft 365 outage business continuity
Use existing offline work, controlled project files and a deliberate recovery when Microsoft 365 is degraded.
Engineering outage scenario
An illustrative project-team response with controlled offline work, supplier verification and recovery reconciliation.
FAQ
Backup and recovery: common questions
Keep project folders in one place that is backed up, never only on a workstation. Keep file versions long enough to reach last month’s copy, keep at least one copy apart from your network and everyday sign-ins, and back up the workstation setup as well as the files. Then prove it with a test restore of a real project folder, linked files included.
It depends on how much work your firm could stand to redo and on how large the models are. We agree it with you: how often copies are taken, how many versions are kept and for how long, and which projects come back first.
Yes, if the backup kept it and covered the place it lived. The restore check above shows what a backup must include for a single file, a project folder, a mailbox or a whole workstation. A folder deleted in Microsoft 365 a long time ago needs a separate backup of Microsoft 365.
We bring files back from the backup in the order your written restore order sets, starting with the live projects you named. How long that takes depends on what failed and how much data there is, which is why we test restores in advance and write down what each test took.
No. Sync keeps the same files on every device and in the cloud, so a deletion or a damaged file is copied everywhere too. A backup keeps earlier copies apart from the live files, so you can go back to how things were before the problem.
Next step
Find out what you could get back today
Book a free 30-minute IT assessment. We look at where your project files live, what backs them up and when a restore was last tested.